Kitchen Remodeling in NYC — From Board Approval to Walk-Through

Kitchen remodeling in NYC starts with paperwork, not demolition. A co-op board wants an alteration agreement. Moving a sink or gas line often needs a DOB permit. The super wants set elevator times.

General Contractor NYC plans for all three before demo day. Then we build the kitchen. One company runs your job, from the estimate visit to the final walk-through.

All five boroughs · Written, itemized quote · One company start to finish

Get a Free Quote for Your NYC Kitchen Renovation

Tell us your borough, your building type and what you want changed. You get a written, itemized quote.

Quick Answers About Kitchen Remodeling in NYC

Do I need a permit to remodel a kitchen in NYC?

New cabinets alone don’t need a DOB permit. Rerouting gas pipes or adding electrical outlets does. Most of those kitchens need an ALT2 permit, filed by a licensed architect or engineer.

Do I need co-op board approval for a kitchen renovation?

In most co-ops, yes. The board reviews your plans under an alteration agreement before work starts. Condo boards often have a similar review. Your managing agent has the rules for your building.

Who does the plumbing and gas work?

A licensed master plumber. NYC only issues plumbing and gas permits to licensed master plumbers. Electrical work needs its own permit and a NYC licensed electrician.

Which parts of NYC do you work in?

All five boroughs: Manhattan, Brooklyn, Queens, the Bronx and Staten Island.

What Our Kitchen Remodeling Service in NYC Covers

We take on full gut kitchens and smaller updates. Most jobs include some mix of the work below.

  • Layout changes: moving the sink, range or fridge. We can also open a wall where the building allows it.
  • Cabinets and counters: removal, new cabinet install, stone or quartz counters, and backsplash tile.
  • Plumbing and gas: sink and dishwasher lines, gas range hookups and line moves. A licensed master plumber does this work.
  • Electrical and lighting: new outlets, under-cabinet lights and appliance circuits.
  • Floors and walls: tile or wood floors, wall repair, skim coat and paint.
  • Appliances: install of the appliances you pick.

If your bathroom needs work too, see our bathroom renovation in NYC service. You can also browse all our NYC renovation services.

Why Homeowners Pick Us for Their NYC Kitchen

  • One company, start to finish. We run the job from the estimate visit to the final walk-through.
  • A written quote first. You get an itemized quote before any work starts.
  • Written change orders. If the scope changes, you sign a change order before the extra work goes ahead.
  • One point of contact. You deal with one person for the whole job.
  • Your building’s rules come first. We plan around board steps, elevator times and set work hours.

[CLIENT TO SUPPLY — 2–3 real kitchen jobs, with permission: borough, building type, scope, year. Do not publish invented projects.]

[AFTER G1 — add: NYC HIC License #[number]. Check it on the DCWP license search before you sign.]

Kitchen Remodeling NYC Costs: What Drives the Price

Five things move a kitchen price in NYC more than anything else:

  • Whether the sink, range or gas line moves. Moving them adds plumbing work, and often a permit.
  • Cabinets: stock, semi-custom or custom.
  • Counter material and how much of it you need.
  • Building rules, such as set work hours, elevator booking and insurance limits.
  • Old walls and pipes in pre-war buildings. They often hide problems you only find after demo.

You get a fixed, written quote after the estimate visit. For line-by-line numbers, read our NYC kitchen renovation cost guide. Working with a tight space? See our breakdown of small kitchen remodel cost in NYC.

NYC Permits, Boards and Building Rules for Kitchens

DOB permits

The NYC Department of Buildings says most kitchen renovations need an ALT2 permit. That applies when you reroute gas pipes or add electrical outlets. A licensed architect or engineer files the plans. We tell you at the estimate visit if your job needs a permit.

Co-op and condo boards

Most co-ops want plans, insurance certificates and a signed alteration agreement before work starts. Many also hold a renovation deposit. Some buildings won’t let you move a kitchen over a neighbor’s bedroom. Rules differ by building, so we read your alteration agreement first.

Work hours and access

NYC allows construction on weekdays from 7am to 6pm. Many co-ops set shorter hours. We book the freight elevator for deliveries and debris. We also work with your super on water and gas shutoffs.

Pre-war buildings

Older buildings often have uneven floors, old pipes and plaster walls. These can change the scope once the old kitchen comes out. If that happens, you get a written change order first.

Tell Us About Your Kitchen — Free Written Quote

Send your borough, building type and photos if you have them. We’ll reply to set up an estimate visit.

How a Kitchen Remodeling Job Runs With Us

  1. Tell us about your kitchen. Use the quote form or call us.
  2. Estimate visit. We measure, check the building rules and talk through the scope.
  3. Written, itemized quote. You see the scope and the schedule before you sign.
  4. Board and permit steps. We plan the board submission and any permit before demo day.
  5. The build. One schedule, one point of contact, and written change orders for any extra work.
  6. Final walk-through. We walk the kitchen with you and fix anything on the punch list.

How long it takes: board review and permits add time before work starts. That time depends on your building. Your written quote shows the build schedule.

Plan Ahead Before You Call

A few choices save the most time later. Pick your appliances early, because cabinets are sized to them. Ask your managing agent for the alteration agreement now. It often takes the longest to get back.

Building typeWhat to expect for a kitchen job
Co-op (common across Manhattan, such as the Upper West Side)Board review under an alteration agreement. Set work hours. Insurance certificates for the building.
CondoOften a lighter review than a co-op. Still check the bylaws and work hours.
House or brownstone (Brooklyn, Queens, the Bronx, Staten Island)No board. DOB permit rules still apply when gas, plumbing or electrical work changes.

Want to avoid the usual traps? Read our list of costly kitchen remodeling mistakes. For the bigger picture on renovating in the city, see our NYC home renovation guide.

More Questions About Kitchen Remodeling in NYC

How much does kitchen remodeling cost in NYC?

It depends on three things. Do plumbing or gas lines move? What cabinets and counters do you pick? What are your building’s rules? We give you a fixed, written quote after the estimate visit. Our kitchen cost guide covers the line items.

How long does a kitchen renovation take in a NYC apartment?

Plan for two stages. First come board review and any permit, which vary by building. Then comes the build. You see the schedule in your written quote.

Can I live in my apartment during a kitchen remodel?

Most people do. You lose the kitchen for the build, but the rest of the home stays usable.

Can I move my kitchen to another part of the apartment?

Sometimes. Many co-ops ban putting a kitchen over a neighbor’s bedroom or living room. A move also means new gas and plumbing lines, so it needs a permit. We check your building’s rules at the estimate visit.

Ready to Start Your NYC Kitchen Remodel?

Get a free, written quote for your kitchen. We work in Manhattan, Brooklyn, Queens, the Bronx and Staten Island.

or